Home › Compatibility › Heliene 108HC-430 M10 NTYP SL + APsystems DS3-S

Heliene 108HC-430 M10 NTYP SL with APsystems DS3-S

Compatibility and string sizing for this panel and microinverter, calculated from both datasheets.

✓

Compatible

Yes. Each DS3-S takes 2 panels, and up to 6 units fit on one 20 A branch circuit (12 panels). DC/AC ratio 1.34.

How it's calculated

NEC 690.7 coefficient method with the datasheet values. Record low −10 °C, hottest day 40 °C.

By climate

The coldest morning sets the longest string. Record lows are ASHRAE extreme annual mean minimums; the hottest day is kept at 40 °C.

CityRecord lowResult
Minneapolis, MN−27 °C2 panels per unit
Chicago, IL−21 °C2 panels per unit
Denver, CO−23.6 °C2 panels per unit
Atlanta, GA−9.5 °C2 panels per unit
Dallas, TX−7.1 °C2 panels per unit
Phoenix, AZ1.3 °C2 panels per unit
Miami, FL5.9 °C2 panels per unit

Common system sizes

How Heliene 108HC-430 M10 NTYP SL panels lay out on the APsystems DS3-S for typical 6, 8 and 10 kW home systems, using the String Sizer's project calculator at the same −10 °C / 40 °C design temperatures.

SystemPanelsLayoutDC sizeDC/AC
About 6 kW147 × DS3-S on 2 branch circuits6.02 kWp1.34
About 8 kW1910 × DS3-S on 2 branch circuits8.17 kWp1.28
About 10 kW2312 × DS3-S on 2 branch circuits9.89 kWp1.29