Home › Compatibility › JA Solar JAM54S31-405/MR + APsystems DS3-L
JA Solar JAM54S31-405/MR with APsystems DS3-L
Compatibility and string sizing for this panel and microinverter, calculated from both datasheets.
✓
Compatible
Yes. Each DS3-L takes 2 panels, and up to 5 units fit on one 20 A branch circuit (10 panels). DC/AC ratio 1.05.
How it's calculated
NEC 690.7 coefficient method with the datasheet values. Record low −10 °C, hottest day 40 °C.
- ✓ Max input voltageVoc at the record low is 40.6 V, within the 60 V limit (68%).
- ✓ MPPT window, hot dayVmp on the hottest day is 25.6 V, inside 25–55 V.
- ✓ MPPT window, cold dayVmp on the coldest day is 35.3 V, inside the MPPT range.
- ✓ Input currentImp 12.98 A is within the 18 A max input current. The datasheet gives no separate Isc limit.
- ✓ Module power pairing405 W is inside the recommended 265–570 (DC/AC 1.05).
By climate
The coldest morning sets the longest string. Record lows are ASHRAE extreme annual mean minimums; the hottest day is kept at 40 °C.
| City | Record low | Result |
|---|---|---|
| Minneapolis, MN | −27 °C | 2 panels per unit |
| Chicago, IL | −21 °C | 2 panels per unit |
| Denver, CO | −23.6 °C | 2 panels per unit |
| Atlanta, GA | −9.5 °C | 2 panels per unit |
| Dallas, TX | −7.1 °C | 2 panels per unit |
| Phoenix, AZ | 1.3 °C | 2 panels per unit |
| Miami, FL | 5.9 °C | 2 panels per unit |
Common system sizes
How JA Solar JAM54S31-405/MR panels lay out on the APsystems DS3-L for typical 6, 8 and 10 kW home systems, using the String Sizer's project calculator at the same −10 °C / 40 °C design temperatures.
| System | Panels | Layout | DC size | DC/AC |
|---|---|---|---|---|
| About 6 kW | 15 | 8 × DS3-L on 2 branch circuits | 6.08 kWp | 0.99 |
| About 8 kW | 20 | 10 × DS3-L on 2 branch circuits | 8.10 kWp | 1.05 |
| About 10 kW | 25 | 13 × DS3-L on 3 branch circuits | 10.12 kWp | 1.01 |