Home › Compatibility › Jinko Solar Tiger Neo JKM425N-54HL4-B + SMA STP 62-US-41

Jinko Solar Tiger Neo JKM425N-54HL4-B with SMA STP 62-US-41

Compatibility and string sizing for this panel and string inverter, calculated from both datasheets.

✓

Compatible

Yes. At a −10 °C record low and a 40 °C hot day, strings of 6–23 panels work. The longest string reaches 974 V on the coldest morning, under the 1000 V inverter limit. One SMA STP 62-US-41 takes up to 9 strings of 23: 207 panels, 87.97 kWp DC, DC/AC ratio 1.41.

How it's calculated

NEC 690.7 coefficient method with the datasheet values. Record low −10 °C, hottest day 40 °C.

By climate

The coldest morning sets the longest string. Record lows are ASHRAE extreme annual mean minimums; the hottest day is kept at 40 °C.

CityRecord lowResult
Minneapolis, MN−27 °C6–22 panels per string (best 22)
Chicago, IL−21 °C6–23 panels per string (best 23)
Denver, CO−23.6 °C6–22 panels per string (best 22)
Atlanta, GA−9.5 °C6–23 panels per string (best 23)
Dallas, TX−7.1 °C6–23 panels per string (best 23)
Phoenix, AZ1.3 °C6–24 panels per string (best 24)
Miami, FL5.9 °C6–24 panels per string (best 24)

Common system sizes

How Jinko Solar Tiger Neo JKM425N-54HL4-B panels lay out on the SMA STP 62-US-41 for one, two and four fully loaded inverters, using the String Sizer's project calculator at the same −10 °C / 40 °C design temperatures.

SystemPanelsLayoutDC sizeDC/AC
1 inverter, fully loaded22011 strings of 20 on 1 inverter93.50 kWp1.50
2 inverters, fully loaded44022 strings of 20 on 2 inverters187.00 kWp1.50
4 inverters, fully loaded88044 strings of 20 on 4 inverters374.00 kWp1.50