Solar design tools for Northern Emirates (Etihad WE)
The Tera Labs tools, set up for Northern Emirates (Etihad WE): array voltage at 0 °C, 50 °C ambient, the 1,500 V rooftop limit, IEC 62548 string fuses and Etihad WE's capacity rule.
Northern Emirates rules these tools apply
- Design temperatures. Section 2.1: work out the array voltage at 0 °C, or lower where the site gets colder (mountain sites such as Jebel Jais in Ras Al Khaimah). Inverters must cope with 50 °C, and with 60 °C at no more than 25% derating (sections 2.1 and 2.2.3).
- Voltage limit. Etihad WE's Distributed Solar Systems Standards (section 2.1) limit rooftop systems to 1,500 V DC open-circuit at 0 °C. Above 1,500 V a system can't go on a building: only ground-mounted, canopy or restricted-access structures.
- String fuses. Outside Dubai the tools use the IEC 62548 check, written the same way as DEWA's DRRG 2.6.1: string fuses are needed when (strings in parallel − 1) × the panel's short-circuit current is above its maximum series fuse rating. gPV fuses are then rated between 1.5 and 2.4 × Isc and no higher than the panel's fuse rating. Some editions add a safety factor to Isc, so near the limit check the edition your authority uses.
- Capacity and scheme. Up to 1 MW per premises (section 1), for Ajman, Umm Al Quwain, Ras Al Khaimah and Fujairah. Single-phase inverters are limited to 10 kW per phase, balanced across phases (section 2.5.1). Connection is at LV (240/415 V) or 11 kV.
- Equipment. Main components must come from Etihad WE's List of Approved Equipment on its Solar Platform (section 2.1). Check it before you apply.
Other markets: all Gulf solar tools.