String sizing for Dubai under DEWA's DRRG rules
Stringing in Dubai follows the same physics as anywhere else: Voc rises in the cold, Vmp falls in the heat, and each MPPT has current limits. What changes are the design temperatures and the voltage limits, which come from DEWA's Standards for Distributed Renewable Resources Generators (DRRG Standards) rather than the US electrical code.
Maximum voltage at 0 °C
DRRG Standards section 2.1 asks for the maximum PV array voltage at a minimum outdoor temperature of 0 °C. Dubai rarely gets that cold, but it is the fixed design value, so every submission uses it.
Example: the Jinko Tiger Neo 3.0 JKM650N-66QL6-BDV has a Voc of 50.26 V and a coefficient of −0.24 %/°C. At 0 °C: 50.26 × [1 + 0.0024 × 25] = 53.28 V per panel. On a building (1,000 V) that allows ⌊1000 ÷ 53.28⌋ = 18 panels per string. On a private villa (600 V) it allows 11.
DEWA voltage classes
- Private villas: up to 600 V DC.
- Other buildings: up to 1,000 V DC.
- Canopies and urban structures not on a building: up to 1,500 V DC (section 2.1(3)), if the inverter and panels are rated for it.
The tool uses the lowest of the DEWA class, the inverter's maximum DC input and the panel's maximum system voltage.
Hot side: 50 °C ambient and the PVsyst thermal model
DEWA sets 50 °C as the maximum outdoor ambient. Cell temperature on a Dubai roof is far higher, and it depends on how well the back of the panel is ventilated. Instead of the module's NOCT, the tool uses the PVsyst thermal model that most UAE designers use: Tcell = Tamb + 0.9 × 1000 × (1 − η) ÷ Uc, with a loss factor Uc of 20 W/m²K for sheet roofs, 25 for concrete (RCC) roofs and 29 for open carports.
For a 24% efficient panel on a sheet roof: 50 + 0.9 × 1000 × 0.76 ÷ 20 = 84 °C. The Vmp of the JKM650N then drops to about 34.9 V, so the MPPT minimum sets a floor of around 6 panels on a typical commercial inverter. A carport (Uc 29) runs about 10 °C cooler, so short strings have more margin.
String fuses (DRRG 2.6.1)
String overcurrent protection is needed when (number of strings in parallel − 1) × the module's short-circuit current is above the module's maximum series fuse rating. With three strings on one MPPT of the JKM650N (Isc 15.98 A, fuse rating 35 A): 2 × 15.98 = 31.96 A, so no fuses are needed at STC. With the 11.4% bifacial gain it reaches 35.6 A, which is just over, so the tool flags it for you to confirm with the inverter maker. When fuses are needed, gPV fuses are rated between 1.5 and 2.4 × Isc and no higher than the module's fuse rating.
Eligible equipment
DEWA only accepts panels and inverters on its eligible equipment list. The tool marks models that were on it when we last checked, but the list changes, so always confirm on DEWA's portal before you submit. For whole projects with several roofs and inverter models, use the Dubai Project Planner.