Solar design tools for Abu Dhabi (DoE / ADDC / AADC)
The Tera Labs tools, set up for Abu Dhabi (DoE / ADDC / AADC): array voltage at 0 °C, 50 °C ambient, the 1,000 V or 1,500 V class, IEC 62548 string fuses and DoE / ADDC / AADC's capacity rule.
Abu Dhabi rules these tools apply
- Design temperatures. No design temperature is published in the self-supply policy. The tool uses 0 °C for the maximum string voltage and 50 °C ambient, the values DEWA and Etihad WE set for the UAE. Inland desert sites get colder than the coast, so lower the design minimum if your site has recorded sub-zero nights.
- Voltage limit. The DoE Self-Supply Policy (Feb 2026) leaves technical limits to the Distribution Code and the DoE Solar PV Installation Guidance and states no DC voltage. Pick the 1,000 V or 1,500 V class that matches your panels and inverter; the tool also checks the inverter's maximum DC input and the panel's maximum system voltage.
- String fuses. Outside Dubai the tools use the IEC 62548 check, written the same way as DEWA's DRRG 2.6.1: string fuses are needed when (strings in parallel − 1) × the panel's short-circuit current is above its maximum series fuse rating. gPV fuses are then rated between 1.5 and 2.4 × Isc and no higher than the panel's fuse rating. Some editions add a safety factor to Isc, so near the limit check the edition your authority uses.
- Capacity and scheme. Abu Dhabi's PV and Battery Energy Storage Systems for Self-Supply Policy (DoE, 5 Feb 2026) sets no fixed kW limit. Systems are for self-supply: exported energy is not netted or offset unless the DoE authorises it (section 2.1), so size the system to daytime load.
- Equipment. Abu Dhabi has no public eligible-equipment list like DEWA's. Equipment must meet the Distribution Code and the DoE Solar PV Installation Guidance; confirm with your distribution company (ADDC or AADC) before you buy.
Other markets: all Gulf solar tools.