String sizing in Oman (APSR / Nama)
The physics is the same everywhere: Voc rises in the cold, Vmp falls in the heat, and each MPPT has current limits. What changes from market to market are the design temperatures, the voltage limit, the capacity rule and the equipment approval. This page applies APSR / Nama's rules where they are published, and IEC 62548 where they are not.
Design temperatures
No design temperature is published. The tool uses 0 °C and 50 °C, the UAE values, which suit the coast and the interior; use a lower minimum for mountain sites such as Jebel Akhdar or Jebel Shams.
Voltage limit
APSR and Nama don't publish a rooftop DC voltage limit for Sahim. Pick the 1,000 V or 1,500 V class that matches your panels and inverter; the tool also checks the inverter's maximum DC input and the panel's maximum system voltage.
For example, the Jinko Tiger Neo 3.0 JKM650N-66QL6-BDV has a Voc of 50.26 V and a coefficient of −0.24 %/°C. At 0 °C: 50.26 × [1 + 0.0024 × 25] = 53.28 V per panel, so up to 18 under a 1,000 V class and 28 under 1,500 V, if the inverter and panel are rated for it (20 on a common 1,100 V inverter). Pick your panel and inverter above for the exact answer.
Hot side and MPPT window
On the hottest day the cells run well above the air. The tool uses the PVsyst thermal model, Tcell = Tamb + 0.9 × 1000 × (1 − η) ÷ Uc, with Uc 20 for sheet roofs, 25 for concrete (RCC) roofs and 29 for carports, then checks that Vmp at that temperature stays above the inverter's MPPT minimum.
String fuses
Outside Dubai the tools use the IEC 62548 check, written the same way as DEWA's DRRG 2.6.1: string fuses are needed when (strings in parallel − 1) × the panel's short-circuit current is above its maximum series fuse rating. gPV fuses are then rated between 1.5 and 2.4 × Isc and no higher than the panel's fuse rating. Some editions add a safety factor to Isc, so near the limit check the edition your authority uses.
Capacity and scheme
Under Sahim, homeowners install grid-connected rooftop PV and are paid for exported energy at the Bulk Supply Tariff. No fixed kW cap is published; the application states the premises' maximum demand, so confirm the allowed size with Nama.
Equipment approval
We found no public equipment list for Sahim. Confirm panel and inverter acceptance with Nama and use an approved contractor.
Rules checked 26 Nov 2026. These are planning tools, not a utility submission: always check the rules and lists in force before you apply.