String sizing in Qatar (Kahramaa)
The physics is the same everywhere: Voc rises in the cold, Vmp falls in the heat, and each MPPT has current limits. What changes from market to market are the design temperatures, the voltage limit, the capacity rule and the equipment approval. This page applies Kahramaa's rules where they are published, and IEC 62548 where they are not.
Design temperatures
Kahramaa's specification gives no design temperature. 0 °C is a conservative minimum for Qatar, and equipment is checked at 50 °C ambient.
Voltage limit
Kahramaa's Technical Specifications for the Connection of Solar PV Systems set no rooftop DC limit; PV cables are specified to IEC 62930 (1.5 kV DC). Pick the 1,000 V or 1,500 V class that matches your panels and inverter; the tool also checks the inverter's maximum DC input and the panel's maximum system voltage.
For example, the Jinko Tiger Neo 3.0 JKM650N-66QL6-BDV has a Voc of 50.26 V and a coefficient of −0.24 %/°C. At 0 °C: 50.26 × [1 + 0.0024 × 25] = 53.28 V per panel, so up to 18 under a 1,000 V class and 28 under 1,500 V, if the inverter and panel are rated for it (20 on a common 1,100 V inverter). Pick your panel and inverter above for the exact answer.
Hot side and MPPT window
On the hottest day the cells run well above the air. The tool uses the PVsyst thermal model, Tcell = Tamb + 0.9 × 1000 × (1 − η) ÷ Uc, with Uc 20 for sheet roofs, 25 for concrete (RCC) roofs and 29 for carports, then checks that Vmp at that temperature stays above the inverter's MPPT minimum.
String fuses
Outside Dubai the tools use the IEC 62548 check, written the same way as DEWA's DRRG 2.6.1: string fuses are needed when (strings in parallel − 1) × the panel's short-circuit current is above its maximum series fuse rating. gPV fuses are then rated between 1.5 and 2.4 × Isc and no higher than the panel's fuse rating. Some editions add a safety factor to Isc, so near the limit check the edition your authority uses.
Capacity and scheme
Under BeSolar the system must not exceed the contracted demand approved in the building permit (Technical Specifications, section 1), up to 25 MW. Surplus is bought at 0.237 QAR/kWh and credited to later bills. Single- and two-phase inverters only up to 11 kW (section 5.9.8.5).
Equipment approval
Use equipment from Kahramaa's approved materials list, installed by a Kahramaa-approved contractor. Kahramaa lists approved makers and series rather than every model, so the tools mark models in a named series as Kahramaa series (checked 26 Nov 2026); confirm the exact model.
Sources
Rules checked 26 Nov 2026. These are planning tools, not a utility submission: always check the rules and lists in force before you apply.