Solar design tools for Saudi Arabia (SEC / SERA)
The Tera Labs tools, set up for Saudi Arabia (SEC / SERA): array voltage at −5 °C, 55 °C ambient, the 1,000 V or 1,500 V class, IEC 62548 string fuses and SEC / SERA's capacity rule.
Saudi Arabia rules these tools apply
- Design temperatures. Annex D of the SEC standards gives an outdoor ambient range of −5 °C to 55 °C, so the tool works out the string voltage at −5 °C and the hot-day voltage at 55 °C. Northern sites (Tabuk, Al-Jouf, Northern Borders) can get colder than −5 °C: use your site's record low there.
- Voltage limit. SEC's Standards for the Connection of Small-Scale Solar PV Systems set no separate DC voltage limit; PV cables are specified for 1.5 kV DC (Annex E). Pick the 1,000 V or 1,500 V class that matches your panels and inverter; the tool also checks the inverter's maximum DC input and the panel's maximum system voltage.
- String fuses. Outside Dubai the tools use the IEC 62548 check, written the same way as DEWA's DRRG 2.6.1: string fuses are needed when (strings in parallel − 1) × the panel's short-circuit current is above its maximum series fuse rating. gPV fuses are then rated between 1.5 and 2.4 × Isc and no higher than the panel's fuse rating. Some editions add a safety factor to Isc, so near the limit check the edition your authority uses.
- Capacity and scheme. Small-scale systems run from 1 kW to 2 MW per premises (section 4), within the Maximum Connected Capacity set under SERA's regulations (section 6.1). Single- and two-phase inverters are allowed only up to 11 kW (section 6.9.7.5).
- Equipment. SEC keeps no equipment list. Panels and inverters need SASO conformity, and inverters must meet the standards in Annex E: IEC 62109-1/-2, IEC 62116, IEC TS 62910 and IEC 62920.
Other markets: all Gulf solar tools.