Northern Emirates Solar Project Planner (Etihad WE)

Lay out a whole rooftop project: roofs or zones, several inverter models, mixed string lengths on each inverter. Every string is checked at Northern Emirates's design temperatures and fitted to the inverter's MPPTs, and the project is checked against Etihad WE's capacity rule.

Project

Northern Emirates (Etihad WE): array voltage at 0 °C, 50 °C ambient. Section 2.1: work out the array voltage at 0 °C, or lower where the site gets colder (mountain sites such as Jebel Jais in Ras Al Khaimah).

Etihad WE capacity and energy

Default yield 1,720 kWh/kWp a year is a typical rooftop figure for Northern Emirates; replace it with your PVsyst or PVGIS result.

Monthly consumption from Etihad WE bills (kWh, optional)

How it checks

  • Voltage: Voc at the design minimum (0 °C by default) times panels per string, against the lowest of the inverter's max DC input, the panel's max system voltage and the 1,500 V rooftop limit.
  • Hot side: cell temperature from the PVsyst thermal model, Tcell = Tamb + 0.9 × 1000 × (1 − η) ÷ Uc, with Uc 20 (sheet roof), 25 (RCC roof) or 29 (carport). Vmp at that temperature must stay above the MPPT minimum.
  • MPPTs: one string length per MPPT, and no more strings on an MPPT than its inputs and short-circuit current allow.
  • String fuses: IEC 62548, fuses when (strings in parallel − 1) × Isc is above the panel's max series fuse rating; gPV rating between 1.5 and 2.4 × Isc.
  • AC side: the inverter's max output current, to size the cable and breaker under IEC 60364-5-52 and Etihad WE's wiring rules.
  • Capacity: Up to 1 MW per premises (section 1), for Ajman, Umm Al Quwain, Ras Al Khaimah and Fujairah. Single-phase inverters are limited to 10 kW per phase, balanced across phases (section 2.5.1). Connection is at LV (240/415 V) or 11 kV.

Planning tool, not a utility submission. Main components must come from Etihad WE's List of Approved Equipment on its Solar Platform (section 2.1). Check it before you apply.

Planning a rooftop project in Northern Emirates (Etihad WE)

The physics is the same everywhere: Voc rises in the cold, Vmp falls in the heat, and each MPPT has current limits. What changes from market to market are the design temperatures, the voltage limit, the capacity rule and the equipment approval. This page applies Etihad WE's rules where they are published, and IEC 62548 where they are not.

Design temperatures

Section 2.1: work out the array voltage at 0 °C, or lower where the site gets colder (mountain sites such as Jebel Jais in Ras Al Khaimah). Inverters must cope with 50 °C, and with 60 °C at no more than 25% derating (sections 2.1 and 2.2.3).

Voltage limit

Etihad WE's Distributed Solar Systems Standards (section 2.1) limit rooftop systems to 1,500 V DC open-circuit at 0 °C. Above 1,500 V a system can't go on a building: only ground-mounted, canopy or restricted-access structures.

For example, the Jinko Tiger Neo 3.0 JKM650N-66QL6-BDV has a Voc of 50.26 V and a coefficient of −0.24 %/°C. At 0 °C: 50.26 × [1 + 0.0024 × 25] = 53.28 V per panel, so up to 28 under the 1,500 V rooftop limit, or 20 on a common 1,100 V inverter. Pick your panel and inverter above for the exact answer.

Hot side and MPPT window

On the hottest day the cells run well above the air. The tool uses the PVsyst thermal model, Tcell = Tamb + 0.9 × 1000 × (1 − η) ÷ Uc, with Uc 20 for sheet roofs, 25 for concrete (RCC) roofs and 29 for carports, then checks that Vmp at that temperature stays above the inverter's MPPT minimum.

String fuses

Outside Dubai the tools use the IEC 62548 check, written the same way as DEWA's DRRG 2.6.1: string fuses are needed when (strings in parallel − 1) × the panel's short-circuit current is above its maximum series fuse rating. gPV fuses are then rated between 1.5 and 2.4 × Isc and no higher than the panel's fuse rating. Some editions add a safety factor to Isc, so near the limit check the edition your authority uses.

Capacity and scheme

Up to 1 MW per premises (section 1), for Ajman, Umm Al Quwain, Ras Al Khaimah and Fujairah. Single-phase inverters are limited to 10 kW per phase, balanced across phases (section 2.5.1). Connection is at LV (240/415 V) or 11 kV.

Equipment approval

Main components must come from Etihad WE's List of Approved Equipment on its Solar Platform (section 2.1). Check it before you apply.

Sources

Rules checked 26 Nov 2026. These are planning tools, not a utility submission: always check the rules and lists in force before you apply.

Questions about planning a project in Northern Emirates

Can one inverter take strings of different lengths?

Yes, as long as each MPPT carries one string length. The planner fits your string groups onto the inverter's MPPTs, within each MPPT's inputs and current rating, and flags anything left over.

What DC/AC ratio is normal for Gulf rooftops?

Around 1.15 to 1.3 is common for commercial rooftops in the Gulf. The planner can suggest a string split that hits your target exactly, without going over the inverter's maximum PV power.

How big can a solar system be in Northern Emirates?

Up to 1 MW per premises (section 1), for Ajman, Umm Al Quwain, Ras Al Khaimah and Fujairah. Single-phase inverters are limited to 10 kW per phase, balanced across phases (section 2.5.1). Connection is at LV (240/415 V) or 11 kV.

Which panels and inverters are approved in Northern Emirates?

Main components must come from Etihad WE's List of Approved Equipment on its Solar Platform (section 2.1). Check it before you apply.