Home › Gulf › Saudi Arabia › String Sizer

Solar String Sizer for Saudi Arabia (SEC / SERA)

Panels per string for any panel and inverter under Saudi Arabia (SEC / SERA) rules: array voltage at −5 °C, 55 °C ambient, the 1,000 V or 1,500 V class, PVsyst cell temperature by roof type and the string fuse check. For a whole project with several inverters and roofs, use the Saudi Arabia Project Planner.

Tera Labs
Solar string sizing report
Tera Labs · solar string sizing, compatibility and electrical calculators
teralabs.io · hello@teralabs.io

Saudi Arabia (SEC / SERA): string voltage worked out at −5 °C, equipment at 55 °C ambient. Hot-cell temperature uses the PVsyst model for the roof type you pick. String fuses follow IEC 62548.

Module checks

    String length options

    Voltage window

    MPPT range Full-power MPPT range Start-up voltage Max voltage

    Project calculator

    String diagram

    Prints this page as a 1–2 page report with the diagram.

    How this is calculated

      String sizing in Saudi Arabia (SEC / SERA)

      The physics is the same everywhere: Voc rises in the cold, Vmp falls in the heat, and each MPPT has current limits. What changes from market to market are the design temperatures, the voltage limit, the capacity rule and the equipment approval. This page applies SEC / SERA's rules where they are published, and IEC 62548 where they are not.

      Design temperatures

      Annex D of the SEC standards gives an outdoor ambient range of −5 °C to 55 °C, so the tool works out the string voltage at −5 °C and the hot-day voltage at 55 °C. Northern sites (Tabuk, Al-Jouf, Northern Borders) can get colder than −5 °C: use your site's record low there.

      Voltage limit

      SEC's Standards for the Connection of Small-Scale Solar PV Systems set no separate DC voltage limit; PV cables are specified for 1.5 kV DC (Annex E). Pick the 1,000 V or 1,500 V class that matches your panels and inverter; the tool also checks the inverter's maximum DC input and the panel's maximum system voltage.

      For example, the Jinko Tiger Neo 3.0 JKM650N-66QL6-BDV has a Voc of 50.26 V and a coefficient of −0.24 %/°C. At −5 °C: 50.26 × [1 + 0.0024 × 30] = 53.88 V per panel, so up to 18 under a 1,000 V class and 27 under 1,500 V, if the inverter and panel are rated for it (20 on a common 1,100 V inverter). Pick your panel and inverter above for the exact answer.

      Hot side and MPPT window

      On the hottest day the cells run well above the air. The tool uses the PVsyst thermal model, Tcell = Tamb + 0.9 × 1000 × (1 − η) ÷ Uc, with Uc 20 for sheet roofs, 25 for concrete (RCC) roofs and 29 for carports, then checks that Vmp at that temperature stays above the inverter's MPPT minimum.

      String fuses

      Outside Dubai the tools use the IEC 62548 check, written the same way as DEWA's DRRG 2.6.1: string fuses are needed when (strings in parallel − 1) × the panel's short-circuit current is above its maximum series fuse rating. gPV fuses are then rated between 1.5 and 2.4 × Isc and no higher than the panel's fuse rating. Some editions add a safety factor to Isc, so near the limit check the edition your authority uses.

      Capacity and scheme

      Small-scale systems run from 1 kW to 2 MW per premises (section 4), within the Maximum Connected Capacity set under SERA's regulations (section 6.1). Single- and two-phase inverters are allowed only up to 11 kW (section 6.9.7.5).

      Equipment approval

      SEC keeps no equipment list. Panels and inverters need SASO conformity, and inverters must meet the standards in Annex E: IEC 62109-1/-2, IEC 62116, IEC TS 62910 and IEC 62920.

      Sources

      Rules checked 26 Nov 2026. These are planning tools, not a utility submission: always check the rules and lists in force before you apply.

      Questions about string sizing in Saudi Arabia

      What is the maximum DC voltage for rooftop solar in Saudi Arabia?

      SEC's Standards for the Connection of Small-Scale Solar PV Systems set no separate DC voltage limit; PV cables are specified for 1.5 kV DC (Annex E). Pick the 1,000 V or 1,500 V class that matches your panels and inverter; the tool also checks the inverter's maximum DC input and the panel's maximum system voltage.

      What temperatures should I use for string sizing in Saudi Arabia?

      Annex D of the SEC standards gives an outdoor ambient range of −5 °C to 55 °C, so the tool works out the string voltage at −5 °C and the hot-day voltage at 55 °C. Northern sites (Tabuk, Al-Jouf, Northern Borders) can get colder than −5 °C: use your site's record low there. On the hot side the tool uses the PVsyst thermal model with a loss factor (Uc) of 20 for sheet roofs, 25 for concrete (RCC) roofs and 29 for carports.

      How many solar panels can go in one string in Saudi Arabia?

      For example, the Jinko Tiger Neo 3.0 JKM650N-66QL6-BDV has a Voc of 50.26 V and a coefficient of −0.24 %/°C. At −5 °C: 50.26 × [1 + 0.0024 × 30] = 53.88 V per panel, so up to 18 under a 1,000 V class and 27 under 1,500 V, if the inverter and panel are rated for it (20 on a common 1,100 V inverter). Pick your panel and inverter above for the exact answer.

      When are string fuses needed?

      Outside Dubai the tools use the IEC 62548 check, written the same way as DEWA's DRRG 2.6.1: string fuses are needed when (strings in parallel − 1) × the panel's short-circuit current is above its maximum series fuse rating. gPV fuses are then rated between 1.5 and 2.4 × Isc and no higher than the panel's fuse rating. Some editions add a safety factor to Isc, so near the limit check the edition your authority uses.

      How big can a solar system be in Saudi Arabia?

      Small-scale systems run from 1 kW to 2 MW per premises (section 4), within the Maximum Connected Capacity set under SERA's regulations (section 6.1). Single- and two-phase inverters are allowed only up to 11 kW (section 6.9.7.5).

      Which panels and inverters are approved in Saudi Arabia?

      SEC keeps no equipment list. Panels and inverters need SASO conformity, and inverters must meet the standards in Annex E: IEC 62109-1/-2, IEC 62116, IEC TS 62910 and IEC 62920.