Home › Gulf › Sharjah › Project Planner

Sharjah Solar Project Planner (SEWA)

Lay out a whole rooftop project: roofs or zones, several inverter models, mixed string lengths on each inverter. Every string is checked at Sharjah's design temperatures and fitted to the inverter's MPPTs, and the project is checked against SEWA's capacity rule.

Project

Sharjah (SEWA): array voltage at 0 °C, 50 °C ambient. SEWA publishes no design temperature.

SEWA capacity and energy

Default yield 1,720 kWh/kWp a year is a typical rooftop figure for Sharjah; replace it with your PVsyst or PVGIS result.

Monthly consumption from SEWA bills (kWh, optional)

How it checks

  • Voltage: Voc at the design minimum (0 °C by default) times panels per string, against the lowest of the inverter's max DC input, the panel's max system voltage and the 1,000 V or 1,500 V class.
  • Hot side: cell temperature from the PVsyst thermal model, Tcell = Tamb + 0.9 × 1000 × (1 − η) ÷ Uc, with Uc 20 (sheet roof), 25 (RCC roof) or 29 (carport). Vmp at that temperature must stay above the MPPT minimum.
  • MPPTs: one string length per MPPT, and no more strings on an MPPT than its inputs and short-circuit current allow.
  • String fuses: IEC 62548, fuses when (strings in parallel − 1) × Isc is above the panel's max series fuse rating; gPV rating between 1.5 and 2.4 × Isc.
  • AC side: the inverter's max output current, to size the cable and breaker under IEC 60364-5-52 and SEWA's wiring rules.
  • Capacity: SEWA had not opened a general rooftop net-metering scheme when we checked (November 2026). Any grid-tied system needs SEWA's written approval and a connection agreement before it is energised.

Planning tool, not a utility submission. Use IEC-certified equipment (IEC 61215 and 61730 panels, IEC 62109 and 62116 inverters) with ECAS conformity, and confirm acceptance with SEWA.

Planning a rooftop project in Sharjah (SEWA)

The physics is the same everywhere: Voc rises in the cold, Vmp falls in the heat, and each MPPT has current limits. What changes from market to market are the design temperatures, the voltage limit, the capacity rule and the equipment approval. This page applies SEWA's rules where they are published, and IEC 62548 where they are not.

Design temperatures

SEWA publishes no design temperature. The tool uses 0 °C for the maximum string voltage and 50 °C ambient, the values DEWA and Etihad WE set for the UAE.

Voltage limit

SEWA has not published a rooftop DC voltage limit. Pick the 1,000 V or 1,500 V class that matches your panels and inverter; the tool also checks the inverter's maximum DC input and the panel's maximum system voltage.

For example, the Jinko Tiger Neo 3.0 JKM650N-66QL6-BDV has a Voc of 50.26 V and a coefficient of −0.24 %/°C. At 0 °C: 50.26 × [1 + 0.0024 × 25] = 53.28 V per panel, so up to 18 under a 1,000 V class and 28 under 1,500 V, if the inverter and panel are rated for it (20 on a common 1,100 V inverter). Pick your panel and inverter above for the exact answer.

Hot side and MPPT window

On the hottest day the cells run well above the air. The tool uses the PVsyst thermal model, Tcell = Tamb + 0.9 × 1000 × (1 − η) ÷ Uc, with Uc 20 for sheet roofs, 25 for concrete (RCC) roofs and 29 for carports, then checks that Vmp at that temperature stays above the inverter's MPPT minimum.

String fuses

Outside Dubai the tools use the IEC 62548 check, written the same way as DEWA's DRRG 2.6.1: string fuses are needed when (strings in parallel − 1) × the panel's short-circuit current is above its maximum series fuse rating. gPV fuses are then rated between 1.5 and 2.4 × Isc and no higher than the panel's fuse rating. Some editions add a safety factor to Isc, so near the limit check the edition your authority uses.

Capacity and scheme

SEWA had not opened a general rooftop net-metering scheme when we checked (November 2026). Any grid-tied system needs SEWA's written approval and a connection agreement before it is energised.

Equipment approval

Use IEC-certified equipment (IEC 61215 and 61730 panels, IEC 62109 and 62116 inverters) with ECAS conformity, and confirm acceptance with SEWA.

Rules checked 26 Nov 2026. These are planning tools, not a utility submission: always check the rules and lists in force before you apply.

Questions about planning a project in Sharjah

Can one inverter take strings of different lengths?

Yes, as long as each MPPT carries one string length. The planner fits your string groups onto the inverter's MPPTs, within each MPPT's inputs and current rating, and flags anything left over.

What DC/AC ratio is normal for Gulf rooftops?

Around 1.15 to 1.3 is common for commercial rooftops in the Gulf. The planner can suggest a string split that hits your target exactly, without going over the inverter's maximum PV power.

How big can a solar system be in Sharjah?

SEWA had not opened a general rooftop net-metering scheme when we checked (November 2026). Any grid-tied system needs SEWA's written approval and a connection agreement before it is energised.

Which panels and inverters are approved in Sharjah?

Use IEC-certified equipment (IEC 61215 and 61730 panels, IEC 62109 and 62116 inverters) with ECAS conformity, and confirm acceptance with SEWA.